AMS and Pedernales Electric Cooperative win US$3.24 million energy storage grant

LinkedIn
Twitter
Reddit
Facebook
Email

Source: Advanced Microgrid Solutions
Advanced Microgrid Solutions (AMS) and Pedernales Electric Cooperative (PEC) have been awarded a US$3.24 million grant from the Department of Energy (DOE) to demonstrate the use of energy storage to stabilise high penetrations of solar energy into Texas’ electric grid.

The grant is under the DOE’s SunShot Initiative. The project will be led by AMS, but Opus One Solutions and Gridbright are also involved in the partnership with the PEC – the largest electric distribution cooperative in the nation.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The AMS Armada platform will be used to design, optimise and manage distributed solar and other distributed energy resources (DER) that maximise behind-the-meter at end-use customer sites and Opus One’s GridOS software platform will provide full grid visibility, DER optimisation, and real-time transactional capability to PEC at the distribution system level.

“Texas is the new frontier for integrating renewable energy into the electric grid,” said AMS CEO Susan Kennedy. “The enormous penetration of wind and solar in Texas has created significant challenges in managing the distribution grid. PEC is taking on a challenge the whole country is facing.”

“This project will demonstrate end-to-end optimization of DER resources and give distribution operators the situational awareness and control needed to maintain grid reliability while cost-effectively serving our members,” added Peter Muhoro, PEC Chief Strategy Officer.

AMS partnered on a similar project with the Texas Electric Cooperatives (TEC) a 200kWh energy storage system at its Master Distribution Centre in Georgetown, Texas, for reducing TEC’s peak energy demand as well as providing stability and frequency regulation to the electric grid.

Read Next

July 18, 2025
The Australian Energy Market Operator (AEMO) has made grid-forming BESS a priority for the National Electricity Market (NEM) and South West Interconnected System (SWIS) for 2026.
July 17, 2025
As the US looks to establish reliable battery supply chains, TerraFlow Energy and ESS Tech look beyond lithium-ion for long-duration energy storage solutions.
July 17, 2025
D.E. Shaw Renewable Investments (DESRI) has started construction at a 150MW solar-plus-storage project in the US state of New Mexico, the BESS for which will be manufactured in the US by LG Energy Solution.
July 16, 2025
London Stock Exchange-listed Gore Street Energy Storage Fund (GSF) has entered into an agreement to sell its investment tax credits (ITCs) for the Big Rock energy storage project in California, US.
Premium
July 16, 2025
Peak Energy president and CCO Cameron Dales speaks with Energy-Storage.news about the state of the battery storage industry after the signing of the Budget Reconciliation Act into law.

Most Popular

Email Newsletter