RWE’s first Dutch BESS online, commissioning ongoing for grid-forming second
Independent power producer (IPP) RWE has commissioned a 35MW/41MWh BESS in the Netherlands, while commissioning is progressing on a smaller system with grid-forming capabilities.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed