Peak time to take action

LinkedIn
Twitter
Reddit
Facebook
Email

In the hierarchy of grid needs, peaking power is often a priority in terms of providing resiliency and balance to the network. This is usually provided by natural gas turbines, which come at a high environmental and economic cost. Andy Colthorpe charts the rise of the solar-plusstorage peaker plant.

Document Access

Read Next

September 22, 2022
A flow battery supply deal will accelerate a California municipal utility’s decarbonisation while derisking that process.
September 22, 2022
FlexGen has signed a multi-year supply deal with CATL that the energy storage company’s CEO said puts it ahead of the queue.
September 22, 2022
Oil and gas major TotalEnergies, thermal energy storage system company 1414 Degrees and six other companies have joined the Long Duration Energy Storage (LDES) Council.
September 22, 2022
Power conversion technology provider Ampt has received an order for its String Optimizers to power a large solar-plus-storage plant with an energy capacity of 600MWh in California.
September 22, 2022
Shanghai-based WeView has raised US$56.5 million in several rounds of financing to commercialise the zinc-iron flow battery energy storage systems technology originally developed by ViZn Energy Systems.

Most Popular

Email Newsletter

Resource Access