‘Grid fee reforms step in right direction, but not enough’: Dutch developer on 2GWh permitted BESS
Developer LC energy has won an irrevocable permit for a 500MW/2,000MWh battery energy storage system (BESS) in the Netherlands, one of the largest in the country to do so.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed