Sosteneo’s 370MWh grid-forming BESS in Victoria, Australia, enters full operations
Australian renewable energy developer Edify Energy has confirmed that the 185MW/370MWh Koorangie battery energy storage system (BESS) in Victoria is fully operational.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed