Arevon lands US$1.1 billion package for California solar PV and 600MWh BESS project

LinkedIn
Twitter
Reddit
Facebook
Email

Renewables developer and operator Arevon Energy has secured US$1.1 billion in debt and tax equity financing for a solar-plus-storage project in California, which features a 150MW/600MWh BESS.

Wells Fargo provided a US$431 million tax equity commitment, while Arevon obtained US$654 million of debt financing including a construction-to-term loan, a tax equity bridge loan and letter of credit facilities. The package will go towards the construction of the 374MWdc Eland solar project.

Located in Kern County, California, the Eland 2 solar-plus-storage project is under early-stage construction and is expected to come online in the first quarter of 2025. Arevon Energy signed a long-term power purchase agreement (PPA) with Southern California Public Power Authority for the project, providing 200MWac of electricity to Southern California.

The project will also use Tesla’s Megapack 2 XL for the battery energy storage system (BESS) portion. US engineering, procurement, and construction (EPC) contractor SOLV Energy will be the project’s EPC contractor.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

September 14, 2026
UAE state-owned renewables company Masdar has partnered with Germany’s Luxcara for battery storage and wind energy projects.
September 11, 2026
Greek renewables developer Metlen Energy & Metals has signed an agreement with utility Copec for the sale of the Tamarico II solar-plus-storage project in Chile’s Atacama region.
September 11, 2026
Our collection of user-posted analysis, views, and unofficial news, gathered from our networks on LinkedIn, returns for its third outing.
Premium
September 10, 2026
We hear from Angus Gordon Lennox, chair of the Gore Street Energy Storage Fund (GSF), which faces a shareholder vote next week on its future. 
September 10, 2026
The venture-capital-style returns once available in Australia have disappeared, according to panellists at the Battery Asset Management Summit Australia 2026.