AMPYR Australia bags 5.3.4 letter for 270MW grid-forming battery storage system
AMPYR Australia has received a 5.3.4 letter from AEMO for the 270MW Northern Battery near Port Augusta in South Australia.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed