ACE Power finalises the sale of ‘ready-to-build’ 206MWh grid-forming BESS in Australia
ACE Power has confirmed the sale of the 103MW/206MWh Kerang grid-forming BESS in the Loddon Valley region of Victoria, Australia.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed